Mae penderfyniad wedi'i wneud, felly nid yw'r cyngor yn derbyn sylwadau mwyach. Caniatawyd, 10 Hydref 2023.
Cais yn dod i law
Mae'r cyngor yn gwirio bod y cais yn gyflawn ac yn rhoi rhif cyfeirnod iddo.
Ymgynghori
Mae'r cyngor yn rhoi gwybod i gymdogion ac eraill, fel arfer gyda hysbysiad safle neu lythyrau. Gall unrhyw un roi sylwadau, fel arfer o fewn 21 diwrnod.
Penderfyniad
Mae'r rhan fwyaf o geisiadau'n cael eu penderfynu gan swyddogion cynllunio'r cyngor. Mae rhai mwy neu ddadleuol yn mynd i'r pwyllgor cynllunio, lle mae cynghorwyr yn penderfynu'n gyhoeddus.
Ar ôl y penderfyniad
Os gwrthodir caniatâd, gall yr ymgeisydd apelio i Benderfyniadau Cynllunio ac Amgylchedd Cymru. Ni all pobl eraill apelio, ond gallan nhw roi sylwadau ar apêl.
Daeth i law 5 Hydref 2026
26/02096/HSE
Daeth i law 2 Hydref 2026
26/02090/HSE
Proposed single storey rear extension, small double height extension and attic conversion including roof extensions
Yn aros am benderfyniad440 m
Daeth i law 14 Medi 2026
26/01952/NMA
Proposed Non-Material Amendment to Planning Permission 01/01198/N - To restrict the opening of the first-floor window on the west elevation to a maximum of 75 mm and require obscurity to a height of 1.7 metres above internal floor level (instead of the requirement that the relevant window be "non opening below a height of 1.8 metres above internal floor level and glazed with obscure glass" as required by Condition 4).
Caniatawyd423 m
Daeth i law 11 Medi 2026
26/01928/WTTPFP
G8 Oak, ash, hazel Green - Crown lift group to 5m over residential gardens and cut back by 2m from building The reasons for the recommended work specifications above are detailed within the attached report, all work will be conducted to BS3998 standards. The applicant is open to the replacement of trees lost, any further information required can be requested
Caniatawyd342 m
Daeth i law 7 Medi 2026
26/01888/HSE
Daeth i law 27 Awst 2026
26/01822/NMA
Proposed Non-Material Amendment to Planning Permission 26/00493/FUL- amend the operation of Condition 3 so that the demolition phase and the subsequent construction phase are controlled separately.
Caniatawyd395 m