Application received
The council checks the application is complete and gives it a reference number.
Consultation
The council tells neighbours and others, usually with a site notice or letters. Anyone can comment, usually within 21 days.
Decision
Most applications are decided by the council's planning officers. Larger or disputed ones go to the planning committee, where councillors decide in public.
After the decision
If permission is refused, the applicant can appeal to Planning and Environment Decisions Wales. Other people can't appeal, but can comment on an appeal.
Only planning matters count in a decision: things like the look of a building, traffic, noise, overlooking, loss of light, and the council's local development plan. A fall in the value of a neighbouring home doesn't count, nor does who the applicant is.
Received 15 August 2025
25/0577/COU
Received 14 August 2025
25/0565/NOTAF
Received 14 August 2025
25/0572/CLPU
Obtain a Lawful Development Certificate for proposed rear extension
Approved
Received 14 August 2025
25/0566/FULL
Erect a surface-mounted ancillary storage and assembly building, anchored to an existing concrete base
Approved
Received 14 August 2025
25/0569/CLPU
Obtain a Lawful Development Certificate for proposed removal of existing lean-to conservatory and replace with new single-storey extension to the rear elevation
Approved
Received 14 August 2025
25/0571/HH
Received 14 August 2025
25/0575/DNS
Install, operate and subsequent decommissioning of a renewable energy scheme comprising ground mounted photovoltaic solar arrays together with substation compound, transformer stations, internal access track, landscaping, biodiversity measures, boundary fencing, security measures, CCTV posts, monitoring house, storage containers, access improvement and ancillary infrastructure, the solar arrays will have a combined capacity of up to 39.9MWp
Waiting for a decision
Received 13 August 2025
25/0561/COND
Discharge condition 06 (Construction Traffic Management Plan) of planning consent 23/0470/FULL (Erect a synchronous condenser with ancillary infrastructure and associated works including access and landscaping, and a cable connection to the adjacent existing substation for the purpose of supplying grid stability to the National Grid as part of their pathfinder 3 initiative)
Approved
Received 13 August 2025
25/0563/COND
Discharge conditions 03 (Contamination - scheme to treat) and 05 (Contamination - validation) of planning consent 23/0247/FULL (Erect B1/B2/B8 unit and associated works)
Approved
Received 13 August 2025
25/0562/FULL
Install a new 150 No. seater fabricated steel stand to meet tier 2 criteria
Approved
Received 13 August 2025
25/0567/COND
Discharge condition 05 (Contamination - validation) of planning consent 22/0994/LA (Change the use of former comprehensive school to a vulnerable learners facility, demolish existing building and erect sports hall with MUGA and associated external works)
Approved
Received 13 August 2025
25/0568/COND
Discharge condition 17 (Details of means of access ) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Approved
Received 13 August 2025
25/0564/HH
Received 12 August 2025
25/0559/RET
Retain and complete conversion of former kennels and associated works
Refused
Received 12 August 2025
25/0558/COND
Discharge conditions 06 (WG Highways 2) and 07 (WG Highways 3) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)
Approved
Received 12 August 2025
25/0557/HH
Demolish existing single storey extension and erect two storey extension, single storey rear extension and rear balcony
Approved
Received 11 August 2025
25/0553/HH
Received 11 August 2025
25/0554/COND
Discharge condition 05 (Structural calculations Retaining Walls) of planning consent 25/0339/HH (Create two parking spaces within the curtilage of the dwelling)
Approved with conditions
Received 11 August 2025
25/0555/HH
Construct a single storey outbuilding within the rear garden
Approved
Received 8 August 2025
25/0552/FULL
Construct an internal access road to facilitate the future expansion of Oakdale Business Park
Approved
Received 7 August 2025
25/0556/HH
Erect single storey rear extension and first floor side extension with associated works
Approved
Received 7 August 2025
25/0550/COND
Discharge of condition 3 (Noise scheme) of planning consent 24/0903/COU (Change the use for a medieval axe throwing venue consisting of four throwing lanes with eight targets in total venue including office space and workshop)
Approved
Received 7 August 2025
25/0547/HH
Install walk in cat and dog cage off the kitchen door, erect small wooden garden fence on top of existing brick wall and erect a wood, metal and PVC 20ft x 8ft multifunctional temporary structure shed/garden room building
Approved
Received 7 August 2025
25/0551/RET
Received 7 August 2025
25/0549/COU
Change the use from Doctors surgery to a residential flat
Refused
Received 6 August 2025
25/0546/CLPU
Obtain a Lawful Development Certificate for proposed garden room
Approved
Received 6 August 2025
25/0545/COU
Change the use of part of the car park to allow for the siting of a food/drink van
Approved
Received 6 August 2025
25/0544/TPO
Remove tree (T002) and remove Himalayan balsam from the watercourse edge throughout the woodland to prevent its build up and spread within the woodland (Tree Preservation Order 38/07/CCBC)
Approved
Received 6 August 2025
25/0548/HH
Received 6 August 2025
25/0545/COU
Change the use of part of the car park to allow for the siting of a food/drink van
Approved
Received 5 August 2025
25/0540/HH
Received 5 August 2025
25/0543/COND
Discharge of conditions 06 (Bike Store), 07 (Biodiversity Strategy - LEMP), 08 (tree protection and method statement), 09 (tree planting details), 10 (hard and soft landscaping details), 11 (boundary treatment), 13 (waste collection), 19 (affordable housing detail) of Planning Permission 24/0875/LA (Erect 16 residential units and associated highway, drainage and landscape infrastructure)
Approved
Received 5 August 2025
25/0542/COND
Discharge conditions 03 (Protective Fencing), 04 (Landscaping), 09 (Contamination), 10 (Imported soils & hardcore), 11 (Contamination-validation), 12 (Dust Control), 13 (Noise Mitigation: Construction) and 20 (Boundary Treatments) of planning consent 25/0009/FULL (Erect two dwellings and access)
Approved
Received 4 August 2025
25/0539/HH
Received 4 August 2025
25/0541/NMA
Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of condition 22 (Borrow Pit Restoration Plan) to allow the construction works which would not impact upon the borrow pits to commence
Approved
Received 1 August 2025
25/0537/FULL
Form jet wash bay including 1.8m high glazed screens and air/screen wash and car vacuum units
Approved
Received 31 July 2025
25/0534/CLPU
Obtain a Lawful Development Certificate for a proposed rear extension
Approved
Received 31 July 2025
25/0536/COND
Discharge condition 11 (Construction Transport Management Plan) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Approved with conditions
Received 31 July 2025
25/0535/COND
Discharge conditions 14 (Highways Condition Survey) and 15 (Remediation scheme for damage) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Waiting for a decision
Received 30 July 2025
25/0533/FULL