A decision has been made, so the council is no longer taking comments. Approved, 25 July 2022.
Application received
The council checks the application is complete and gives it a reference number.
Consultation
The council tells neighbours and others, usually with a site notice or letters. Anyone can comment, usually within 21 days.
Decision
Most applications are decided by the council's planning officers. Larger or disputed ones go to the planning committee, where councillors decide in public.
After the decision
If permission is refused, the applicant can appeal to Planning and Environment Decisions Wales. Other people can't appeal, but can comment on an appeal.
Received 28 August 2026
26/01829/DOC
Discharge of Conditions 24 (Ground Gases), 25 (Contamination), 26 (Remediation Scheme and Verification Plan), 44 (Archaeological Works), 45 (Piling and Foundation Design), 49 (Foul Water Drainage Scheme), 50 (Potable Water Scheme), 53 (Construction Environmental Management Plan) and 55 (Autumn Lady Trees) of 26/00425/VAR
Waiting for a decision471 m
Received 3 August 2026
26/01645/RES
Application for the approval of reserved matters (appearance, scale, layout, landscaping and access) for Phase 2 and 2A of hybrid/outline planning permission 26/00425/VAR for a new Commercial Office (Use Class B1) (as a replacement for County Hall) and Leisure Floorspace (Use Class D1/D2) (associated with the Wales Millennium Centre), together with temporary and permanent road infrastructure, landscaping, drainage, active travel routes, demolition, engineering and remediation works, and the creation of future serviced development plots.
Waiting for a decisionNamed on a planning committee agenda413 m
Received 26 June 2026
26/01340/DOC
Partial discharge of conditions 10 (Waste Strategy) and 21 (Extraction Fumes) of 26/00425/VAR.
Approved with conditions471 m
Received 10 June 2026
26/01200/NMA
Proposed Non-Material Amendment to Planning Permission 26/00425/VAR- 1) Hotel elevation treatment updated from composite sandwich panel to metal plank system; 2) Relocation of north east roof plant to the rear elevation, and increased extent of western plant room; 3) Introduction of Air Source Heat Pumps (ASHPs) to the hotel roof in the north-east corner; 4) Plant screen extents to roof updated; 5) Guardrail added to parts of roof as edge protection; 6) Ground floor external doors have been updated on the hotel front elevation (north elevation); 7) Proposed external louvres on the hotel rear elevation (south elevation). 3no. louvres are proposed at ground floor level and 3no. are proposed at Level 1; 8) Cladding on the southern elevation has dropped circa 250mm above the under-croft car park; 9) Non-vision spandrel panels added to curtain walling at ground level; 10) Feature gold band flashing extended to meet external door on east elevation; and 11) Bike store relocated at ground floor closer to hotel entrance.
Approved471 m