A decision has been made, so the council is no longer taking comments. Approved with conditions, 6 July 2023.
Application received
The council checks the application is complete and gives it a reference number.
Consultation
The council tells neighbours and others, usually with a site notice or letters. Anyone can comment, usually within 21 days.
Decision
Most applications are decided by the council's planning officers. Larger or disputed ones go to the planning committee, where councillors decide in public.
After the decision
If permission is refused, the applicant can appeal to Planning and Environment Decisions Wales. Other people can't appeal, but can comment on an appeal.
Received 1 October 2026
0/53768
Proposed conversion of upper floors to residential apartments to include demolition of existing rear outrigger and erection of rear extension, improvements to front elevation comprising of removing existing bay structure and replacing with windows opening / detailing to match existing at first floor level, together with improvements to existing ground floor shop fronts (ground floor use to remain as existing) comprising of new hard pilasters, doors and windows.
Waiting for a decision487 m
Received 1 October 2026
0/53718
Non Material Amendment to Planning Approval 0/52746 (Erection of 29 affordable dwellings, formation of new vehicular access from Cwm Road, creation of new internal access road and parking area together with associated works for landscaping and drainage infrastructure) Seek to make minor amendments to the approved plans, including a slight increase of the external footprint of the proposed dwellings and changes to external finishes to accommodate the adoption of flood resilient construction materials, along with the change in the number and location of PV Panels. For further details please see the Cover Note
Decided491 m
Received 21 September 2026
0/53717
Extension and refurbishment of the Venue Cymru theatre foyer to provide a Creative Hub, incorporating Llandudno town library, Conwy Tourist Information Service, new community spaces and creative industry work spaces; Internal refurbishment of the auditorium and adjacent foyer and amenity spaces; Construction of a new lobby to back-stage get-in, new mechanical plant, and a re-cladding of the existing flytower; External landscaping works to the front and rear, including a new landscaped approach to the building from the carpark. Installation of air source heat pumps, solar panels Alterations to car parking layout and highway improvements
Waiting for a decision477 m
Received 17 September 2026
0/53694
Approval of Condition no. 6 (Noise Mitigation Scheme) of Planning Approval 0/53487 (Proposal for change of use of part of first floor from A1 (retail) / A3 (café), to arcade style gaming area (Sui Generis).)
Waiting for a decision371 m
Received 18 August 2026
0/53668
Chane of use of the ground floor only from shop (A1) to office (B1)
Waiting for a decision352 m
Received 29 July 2026
0/53570
Display of 2 no internally illuminated fascia signs, 2 no internally illuminated hanging signs and 1 no internally illuminated window sign
Withdrawn90 m