Flintshire Local Development Plan 2015-2030
Adopted on 24 January 2023. It covers 2015 to 2030.
The plan must be reviewed by January 2027. The council expected to consult on a review report in late 2026.
The main points of the plan on each topic, in plain language. Each point names the policy it comes from and links to the page. They were written automatically from the plan and checked against the words on that page, so read the policy itself before relying on one.
Figures as the plan states them, with the page they're on. Read automatically from the plan and checked against the page's own words.
From the annual monitoring report for 2024-25.
Every October each authority publishes an annual monitoring report, saying how the plan is working: for example, how many homes were built in the year against what the plan expects.
No figures have been read from the latest monitoring report yet.
No replacement plan is under way.
Sites the plan allocates for development, as it lists them. Having a site allocated means the authority expects it to be built on during the plan period; each one still needs planning permission.
12 sites
Recent council and committee meetings with an item on the development plan.
| Magazine Lane, Ewloe |
|---|
| Ewloe |
| Gypsy and Traveller sites |
| page 162 |
| HN8-2 | Gwern Lane, Cae Estyn, Hope | Hope | Gypsy and Traveller sites | page 162 |
|---|
| 4 | Mold Business Park | Mold | Jobs | 3.9 | page 125 |
|---|
| 5 | Chester Road East | Queensferry | Jobs | 3.2 | page 125 |
|---|
| HN8-3 | Riverside, Queensferry | Queensferry | Gypsy and Traveller sites | page 162 |
|---|
| 6 | River Lane | Saltney | Jobs | 1.1 | page 125 |
|---|
| HN8-4 | Castle Park Industrial Estate | Gypsy and Traveller sites | page 162 |
|---|
| STR3A | Northern Gateway Mixed Use Development Site | Mixed use | 72.4 | page 125 |
|---|
| STR3B | Warren Hall Mixed Use Development Site | Mixed use | 19.1 | page 125 |
|---|