Swansea Local Development Plan 2010-2025
Adopted on 28 February 2019. It covers 2010 to 2025.
The plan period ended in 2025. The plan still applies until a new one is adopted, but parts of it may carry less weight when applications are decided.
The main points of the plan on each topic, in plain language. Each point names the policy it comes from and links to the page. They were written automatically from the plan and checked against the words on that page, so read the policy itself before relying on one.
No summary of this plan has been written yet.
Figures as the plan states them, with the page they're on. Read automatically from the plan and checked against the page's own words.
No headline figures have been read from this plan yet.
From the annual monitoring report for 2024-25.
Every October each authority publishes an annual monitoring report, saying how the plan is working: for example, how many homes were built in the year against what the plan expects.
Swansea Local Development Plan 2023-2038 (LDP2)
The new plan would cover 2023 to 2038.
Preferred strategy Reached in February 2025.
The authority has published how much growth the new plan should allow and roughly where, and consulted on it.
Consulting on the draft plan, expected 2026
Sites the plan allocates for development, as it lists them. Having a site allocated means the authority expects it to be built on during the plan period; each one still needs planning permission.
No allocated sites have been read from this plan yet.
Recent council and committee meetings with an item on the development plan.
Some documents couldn't be read: 4jSWANSEA_LDP_2010-2025_ENG_WEB.pdf. The figures above may be incomplete.
The plan's details were last checked on 2 November 2026.