Denbighshire Local Development Plan 2006-2021
It covers 2006 to 2021.
The plan period ended in 2021. The plan still applies until a new one is adopted, but parts of it may carry less weight when applications are decided.
The main points of the plan on each topic, in plain language. Each point names the policy it comes from and links to the page. They were written automatically from the plan and checked against the words on that page, so read the policy itself before relying on one.
Figures as the plan states them, with the page they're on. Read automatically from the plan and checked against the page's own words.
From the annual monitoring report for 2024-25.
Every October each authority publishes an annual monitoring report, saying how the plan is working: for example, how many homes were built in the year against what the plan expects.
Denbighshire Replacement Local Development Plan 2018 to 2033
The new plan would cover 2018 to 2033.
Preferred strategy Reached in May 2023.
The authority has published how much growth the new plan should allow and roughly where, and consulted on it.
The dates in the authority's published timetable have passed and it hasn't published new ones.
Consulting on the draft plan
Sites the plan allocates for development, as it lists them. Having a site allocated means the authority expects it to be built on during the plan period; each one still needs planning permission.
6 sites
Recent council and committee meetings with an item on the development plan.
The plan's details were last checked on 2 November 2026.
| Denbigh |
| Jobs |
| 8 |
| page 46 |
| Lon Parcwr | Ruthin | Jobs | 5.5 | page 46 |
|---|
| St Asaph Business Park | St Asaph | Jobs | 14 | page 46 |
|---|