Powys Local Development Plan (2011-2026)
Adopted on 17 April 2018. It covers 2011 to 2026.
The main points of the plan on each topic, in plain language. Each point names the policy it comes from and links to the page. They were written automatically from the plan and checked against the words on that page, so read the policy itself before relying on one.
Figures as the plan states them, with the page they're on. Read automatically from the plan and checked against the page's own words.
Every October each authority publishes an annual monitoring report, saying how the plan is working: for example, how many homes were built in the year against what the plan expects.
Powys Replacement Local Development Plan (2022-2037)
The new plan would cover 2022 to 2037.
Preferred strategy Reached in August 2024.
The authority has published how much growth the new plan should allow and roughly where, and consulted on it.
The dates in the authority's published timetable have passed and it hasn't published new ones.
Consulting on the draft plan
Sites the plan allocates for development, as it lists them. Having a site allocated means the authority expects it to be built on during the plan period; each one still needs planning permission.
4 sites
Applications whose location, as the planning register gives it, falls inside a site the plan sets aside for building, using the boundaries Powys publishes as map data. Newest first.
Recent council and committee meetings with an item on the development plan.
The plan's details were last checked on 2 November 2026.
| P53 MUA1 | Land between/adj Gwernyfed Avenue | Three Cocks | Mixed use | 32 | 4 | page 189 |
|---|